
Installation
27
Powerware
®
5140 User’s Guide www.powerware.com
Figure 15. The PDU
UPS Startup
Perform the following steps to start up the UPS:
1. Locate the UPS front panel (shipped in a separate box).
2. Attachthe UPS front panel interface connectors to the chassis.
Lift the front panel into place and secure to the chassis with the
attached screws. See Figure 16 and Figure 17.
Figure 16.Installing the UPS Front Panel
Komentáře k této Příručce