
Installation
18
Powerware
®
5140 User’s Guide www.powerware.com
Figure3. Installingthe UPS Chassis
Installing the Batteries
WARNING
Onlyqualifiedservice personnel (suchasa licensedelectrician)shouldperform the
batteryinstallation.Risk ofelectrical shock.
To install the battery trays into the UPS and EBM chassis:
1. Verify that the battery breaker on the UPS and all EBMs is in
the OFF position (see Figure 4).
Figure 4. Battery Breakers
Komentáře k této Příručce