
A --- 4 7
Powerware 9330 (10 kVA--40 kVA) Installation and Operation
164201300 REV. G 061502
DESCRIPTION:
DATE:
DRAWING NO: SHEET:
REVISION:
D
2of6
053001
UPS CABINET
POWER TERMINALS
LOCATION OF UPS CABINET TERMINALS
FRONT VIEW DETAIL
164201300---9
POWERWARE 9330 (25 kVA--40 kVA)
INPUT
BREAKER CB1
AC INPUT TO UPS
RECTIFIER (CB1)
(DUAL INPUT)
AC INPUT TO UPS RECTIFIER
AND BYPASS (TB2)
(SINGLE INPUT)
AC INPUT TO BYPASS (TB2)
(DUAL INPUT)
AC OUTPUT TO
CRITICAL LOAD (TB3)
PHASE A
PHASE B
PHASE A
PHASE B
PHASE C
PHASE C
NEUTRAL
PHASE A
PHASE B
PHASE C
NEUTRAL
---
+
DC INPUT FROM REMOTE BATTERY
Komentáře k této Příručce